Specifications - Railing Design - Canadian > Part III
Execution
3.1
Installation
.1 Give at least three
(3) days notice to the owner before starting work onsite.
.2 Conform to all
the latest Ministry of labour, Occupational Health and
Safety Act requirements during installation of the work.
.3 Take site measurements
to ensure that railings are fabricated to fit surrounding
construction, around obstructions and projections in place,
as shown on the drawings, and to suit service locations.
.4 Install railings
plumb, true, square, straight, level, and accurately and
tightly fitted together and to surrounding construction.
.5 Provide stainless steel anchor bolts, washers, nuts,
sleeves, brackets, clips and other items necessary for
secure installation of the railings.
3.2
Cleaning
.1 Repair areas of
bare metal, welds and shop applied finishes in field only
with the approval of the Consultant.
.2 Clean off dirt
on surfaces resulting from installation.
.3 Touch up coating
where damaged during transport or installation. Use material
approved by the manufacturer.